Pricing and timelines

How long does it take to build a website for a small business?

Group Crazy Pineapple · November 23, 2026 · 5 min read

There is no honest single number. A few-page site and an online store are not the same job, so we do not quote a timeline blind. What we do: after a free 15-minute diagnostic, the written proposal states a fixed delivery date, and the biggest thing that moves it is how quickly your text, photos and access reach us.

Why nobody can give you a date over the phone

When someone says "a website takes two weeks" before asking you a single question, they are guessing or selling. The work behind a site varies too much. A five-page presentation of a plumbing company, a catalogue with online payment and a client portal are three different projects that all get called "a website".

That is why our web design and development process starts with the diagnostic. Fifteen minutes, free, and you leave with an opinion on what to fix first. The date comes after, in writing, once we know what is being built.

The five things that decide the length

If you have nothing written yet, say so at the diagnostic. It does not block the project, but it changes the plan.

What happens between the first call and launch

  1. Free diagnostic (15 minutes). You describe the business, share your current address if you have one, and hear what to fix first.
  2. Written proposal. Pages, features, a fixed price and a delivery date. You read it and ask your questions before deciding.
  3. Mockup. You see your pages in your colours and with your logo before any coding. You approve it or ask for changes.
  4. Build. We build the site according to the proposal. You send what we asked for, on the dates agreed.
  5. Testing and launch. You test the site, tell us what to adjust, then we connect your domain name and switch on the secure connection (https).
  6. Training and follow-up. A short session on how to use it, then a check-in after launch.

Where the delays really come from

In most web projects, the schedule slips for human reasons, not technical ones.

Illustrative example: how your delay moves the date

Illustrative example: suppose the proposal sets launch on the 30th, and your text for four pages was due on the 5th. If it arrives on the 12th, the schedule has lost seven days. In the best case we absorb part of it, but a date built on content you promised cannot hold if the content does not come. Numbers are simple and invented, to show the mechanism, not a measured result.

The reverse is also true. A client who sends everything in the first week and answers questions within a day usually protects the date better than any amount of extra effort on our side.

How to prepare so the date holds

If you are unsure whether your current site needs a rebuild or a few fixes, run the website audit first.

What a fixed date means, and what it does not

Our promise is simple: the date and the price are in writing before you pay anything, and if we miss the date, we keep working for free until the site is delivered. The date assumes you provide your content and access on time, and it assumes the scope in the proposal does not change halfway.

The date is not a promise about results. A new site makes you easier to trust and easier to contact. It does not guarantee a Google ranking, and nobody can honestly promise one. For monthly search work, see marketing and SEO, a separate service.

Wondering about the budget side of the same project? Read how to budget a digital project for the first time. And if your first need is a phone app rather than a site, see how long a mobile app takes.

Common mistakes when planning a website date

Frequently asked questions

Can a website really be built in a few days?

A very small page built from a template can be quick. A custom site with a mockup, your own content, testing and training is a larger job. Ask what is included before comparing timelines.

Does the clock start at the first call?

No. The date in the proposal is counted from when the proposal is accepted and the content and access we need are in hand. That is why we list what we need from you in writing.

Can I launch in stages?

Often, yes. Launching the core pages first and adding the catalogue or portal later can get you online sooner. The proposal states what is in each stage and the date of each.

What if I do not have text or photos yet?

Tell us at the free diagnostic. We will work out how to move forward, and the plan and date will reflect it.

Does a faster site cost more?

The price in your proposal depends on the size of the project. We do not publish a price for websites, because a few-page site, an online store and a web application are not comparable. You get a fixed price in writing after the diagnostic.

Let's talk about your project

Tell us what you need in 15 minutes. You then get a written proposal with a price and a date. Free diagnostic.

Book a free diagnostic